Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Highway 101/6 Project Update – 9/27/17

Posted on September 27, 2017April 3, 2020 by Editor

by Sierra Lauder, Director of Events and Downtown Development, Tillamook Area Chamber of Commerce

This week on Main Street we are seeing exactly how big of a deal the vault underneath the corner of Third and Main is! Monday crews boarded up the Main St windows of Sunflower Flats to protect the windows during the excavation. The Sunflower Flats team rushed over to Rosenberg’s and purchased spray paint to create some temporary signage, where they highlighted that they are open, that there are parking opportunities on Pacific, and their website, where folks can place orders and request deliveries. Tuesday morning the excavators came rolling in, and the sidewalks were demolished and rubble scraped out. Wednesday, Thursday, and Friday, crews will be on site building forms for the footings in that vault, and then next week forming the walls while setting the footings in the next two (much smaller) vaults just to the north in front of Everything Pets and Tangled Yarns. Because of the depth and size of the corner vault, it will take a few weeks for all of the concrete work to be poured and cured prior to the final fill. All fingers are crossed that the rain will be minimal.

The need for dry weather extends to manhole work and grading on Front Street. The rain we had last week provided a glimpse at areas that would be inundated if opened during a storm, so crews are watching the weather closely as they move equipment around the site and planning where to start based on forecasts. The extension in front of the museum property on the corner of Pacific and First is also on deck for grading in preparation of the radial concrete work that will be done there, although progress may vary depending on weather.

This week will also include the installation of more railing throughout the project. Black railing has been unloaded in Second Street Plaza that is destined for the stretches near Wells Fargo and Little Cheese Coin-op Laundromat. Installation of the orange railing on the bridge is also anticipated this week. Preliminary reports indicate that it will be hard to miss.

As you navigate the downtown area, you may notice that the City of Tillamook has begun to install the parking signs from the Temporary Parking plan that was adopted last fall. Hopefully this will help guide visitors (and locals) to the available parking along Ivy and First. Simultaneously, Public Works has been re-striping many of those lots to maximize public utilization. We’ve certainly noticed an increase in the use of those lots from the foot traffic through the Visitor’s Center.

Due to the Chamber’s move downtown, we have a front row seat for most of the action downtown, and have been able to capture some interesting footage of the excavation work. We are doing our best to get that video up on our Tillamook Area of Commerce Facebook page, and will continue to upload interesting video and pictures that we take. You can access these visuals regardless of whether you are a member of Facebook by clicking here: https://www.facebook.com/TillamookChamberOfCommerce/

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Grove avenue closed in Tillamook for maintenance

    May 10, 2025
  • Astoria Farmers Market new, outdoor location with parking, with great Riverwalk access

    May 10, 2025
  • WORDS OF WISDOM: Boycotts and Protests in our Community Garden

    May 9, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}