Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Highway 101/6 Project Update – 4/5/18; Big Changes Coming This Week

Posted on April 8, 2018April 8, 2018 by Editor
www.tillamookcountypioneer.net

By Sierra Lauder, Director of Events and Downtown Development, Tillamook Area Chamber of Commerce

This is the week! Monday, April 9th will be the pivotal day in transitioning in to the next phase of the project. Regardless of the weather, re-striping will take place, freshening up arrows and realigning the traffic pattern on Main Street. North of the bridge, the small buffer area between north and southbound traffic that has been utilized as a turning pocket for Rosenberg’s will disappear, and access in to Rosenberg’s may shift from their north driveway entrance to their south driveway entrance as road work north of the bridge begins in earnest.

South of the bridge to First Street, what happens on Monday will depend on the weather. The stretch of the road that runs from the southern end of the new bridge to First Street that has been stripped down and regraded is set to be repaved. However, asphalt requires certain temperatures and climate conditions, and with the ever evolving forecast it is too volatile to be sure that paving can occur Monday. If it doesn’t work out for Monday, getting that paving in and complete will be the top priority as soon as weather allows.

Main Avenue in the downtown, from First to Fourth, will see a dramatic change. Regardless of weather, the gap between the new curb and gutter and the road base along the east side of Main will be filled, and then the new striping will shift the traffic all the way to the east side of Main along the newly completed sidewalk there. Parking on both sides of the street between First and Fourth will remain closed, and construction on the west side of Main will begin.

Crews out stripping wires, cable, and conduit from temporary poles Tuesday afternoon. TPUD will be removing them now that the permanent signals have gone live on Pacific Ave.
The end of this week will see the finalization of the night work on the lights on Pacific- things have been progressing quickly there, with Oregon State Bridge, Oneill Electric, and ODOT all on site each night this week. Tillamook PUD and Comcast have been very active during the day, moving lines and wires and getting the temporary poles stripped and ready for removal.
Bioswale on the east side of Main Avenue prior to the liner. Liners are scheduled to begin installation today, Thursday, and then temporary fill will be added prior to the final planting in September.
The liners for the bioswales on the east side of Main are scheduled for installation starting April 5th, and as the liners go in, fill will be added to each pit. Final planting of the bioswales will not take place until September.

In front of the Pioneer Museum, the radial concrete pattern is finished, and the spaces that remain will become planter areas. The top soil and planting will be placed this September as part of the last phase of the project.
Despite the rain, sidewalk work on the east side of Main downtown should wrap up shortly, and then sidewalk crews will move to the bridge to continue work while the traffic shift occurs.

Stay safe out there.

For more FAQ’s about our project, including conceptual drawings that help visualize the project in its entirety, you can check out the ODOT page: www.TillamookTraffic.org

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Tillamook FFA Excels in State Career Development Events: Two Teams Headed to Nationals

    May 12, 2025
  • Tillamook Police Department Invites Community for Coffee with a Cop May 14th

    May 12, 2025
  • GORDON'S WEEKLY WEATHER UPDATE 5/12/25: Showery Pattern Continues Through Week

    May 12, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}