Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Highway 101/6 Project Update (5/3/18)

Posted on May 3, 2018 by Editor

By Sierra Lauder, Director of Events and Downtown Development, Tillamook Area Chamber of Commerce
Traffic impacts should be less extreme this week and next, as flagging through the intersections has wrapped up. Excavation on the block between First and Second on the west side of Main for a bioswale will likely keep traffic to one lane for that block through the end of this week. Early next week, that excavation work will shift to the northwest corner of the intersection of Third and Main, where sidewalk removal has already begun. The future sushi restaurant is also undergoing heavy renovation on that corner, and the timing will be close for the opening of the restaurant and the sidewalk there later this month.

On the bridge, railing and pylons are being formed and poured. The process starts with the plywood rectangular forms that we’ve seen go up this week, and will last a few more weeks before the results are unveiled. Drainage and grading on either side of the bridge progresses, so expect to see large equipment steadily active in that area as we approach summertime and the opening of the bridge.

Formation of the rail and pylons on the west side of the new bridge.
New lights installed at the Hoquarton Slough Trailhead.

Less obvious, but also big steps for the project: lighting has been installed in the Hoquarton Trailhead area- the west end of the “Crosstown Connection” trail project. On the east end, the pedestrian crossing on the railroad bridge that crosses Highway 6 and leads in to Goodspeed Park is coming along nicely. Protective fencing is set to be installed next week, allowing access over the bridge for pedestrian use while keeping the rail in place.

Three vaults exist in below the future sidewalk on the north half of the block between First and Second on Main Ave. This week and next, crews excavate, clear them and then reform them to prep for sidewalk above.
As sidewalk demolition begins to heat up on the west side of Main in the downtown area, please remember that several businesses have side doors or rear access- Anderson Florists has a second entrance on Second, Kitty’s Food and Spirits, the Dutch Mill, and the Chamber of Commerce all have rear doors from the parking lot on the corner of the Second and Ivy. Businesses who only have access along Main (Voodoo Vapor, Fat Dog Pizza, Marcie’s Cafe, Tillamook Coliseum Theater, Yo Time, and Shear Bliss) will all have access maintained to their front doors throughout construction.

Be safe out there.
For more FAQ’s about our project, including conceptual drawings that help visualize the project in its entirety, you can check out the ODOT page: www.TillamookTraffic.org

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Tillamook FFA Excels in State Career Development Events: Two Teams Headed to Nationals

    May 12, 2025
  • Tillamook Police Department Invites Community for Coffee with a Cop May 14th

    May 12, 2025
  • GORDON'S WEEKLY WEATHER UPDATE 5/12/25: Showery Pattern Continues Through Week

    May 12, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}