Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Highway 101/6 Project Update — Big News 9/4/18

Posted on September 5, 2018September 5, 2018 by Editor

By Sierra Lauder, Director of Events and Downtown Development, Tillamook Area Chamber of Commerce

Starting today, Wednesday September 5th, there will be 24 hour flagging through the intersection of First and Main. Additionally, trucks turning on to Main southbound will be rerouted to Ivy and down to Front to access Main. There is a large manhole that needs to be excavated and replaced in the southeast quadrant of the intersection, and while crews have been delaying until after Labor Day, the weather forecast that calls for rain as early as this weekend has made it necessary to expedite this work and get it done immediately. Hopes are high that the work may be completed ahead of schedule, but flaggers are set through Friday.

Sawcutting was completed Tuesday (September 4th) afternoon, so excavators will be onsite and removing materials as soon as lanes are closed and flaggers are in place on Wednesday morning.

Looking eastward at the intersection of First and Main. Expect 24 flagging through Friday and a truck detour at Ivy and Front.
Because of the depth and width of the hole, trucks will not have sufficient buffering room to make the south bound turn, regardless of whether approaching from the east or the west. A flagger will be stationed at Ivy and First to direct truck traffic north, where a right turn on to Front will allow for a right turn on to Main. Truck traffic approaching from the east will be directed to continue to the Ivy detour from the First and Main intersection. While the work will be concentrated during the day, the flagging, truck detour, and lane closures will be 24 hours.

The impending rain and shift in the focus of the project delayed the excavation of the south half of the block of Main between Third and Fourth. Final pours on the sidewalk on the north half of the block will be completed Wednesday and Thursday, with excavation on the south side expected to be reset for early next week.

Cutting on the Second Street Plaza adjacent to ADA ramps.

A big change on the Second Street Plaza took place Tuesday afternoon s well. After concerns of tripping on the curbing associated with the ADA ramps, the City was able to work with ODOT to come up with a new design element that increases visibility while reducing curb crossing.


A view of the new triangular planting areas on the Plaza.
Triangular planting areas were cut today adjacent to each of the three ramps on the Plaza. The landscaping contractor arrived onsite this afternoon, and, in addition to these new planters, top soil and plants will begin to fill the bioswales and other greenscape spaces.

While this week will likely feature many frustrating moments, take heart in the knowledge that final paving is setting up prior to October 1, which means we are still very much on track to be wrapped up with traffic impacts in just a few short weeks.
Be safe.

A note from Tillamook Chief of Police, Terry Wright:
Please be advised that the speed limit on Pacific northbound over the new bridge in 20 mph. An astonishing number of local drivers have been ticketed for excessive speed through the area. There is a new crosswalk that stretches from Hoquarton Landing to the “gore”/old Shell Station in that 20 mph zone that drivers need to be aware of.

For more FAQ’s about the project, including conceptual drawings that help visualize the project in its entirety, you can check out the ODOT page: www.TillamookTraffic.org

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Grove avenue closed in Tillamook for maintenance

    May 10, 2025
  • Astoria Farmers Market new, outdoor location with parking, with great Riverwalk access

    May 10, 2025
  • WORDS OF WISDOM: Boycotts and Protests in our Community Garden

    May 9, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}