Menu
  • Home
  • Feature
    • Breaking News
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Weather
  • Post Submission
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Search...
Menu

Bay City Completes Installation of Valves to Protect Water Supply During Earthquake

Posted on July 15, 2025 by Editor

Photos & Story by Don Backman

The City of Bay City announced that is has completed the installation of two seismic valves on two of the city’s water reservoir tanks. “This is a critical part of the City’s preparation for disasters, including the predicted Cascadia fault earthquake and Tsunami,” Liane Welch, Bay City Mayor, explained.

“I want to thank Suzanne Weber for her support during the 2023 legislative process, and she sponsored and shepherded our application,” Welch added. “Bay City will be cut off in the event of a major earthquake and tsunami and the water will be there to help us.” Welch went on to reiterate that the grant and the valves would not have happened without the work Suzanne Weber put in.

“It was a pleasure to work with you,” Senator Weber said. “I am pleased with what you have done and pleased that I was able to help.” The process took two years to complete. The special valves have to be built to order. The project cost $250,000.

(From Left) Bay City City Manager David McCall, State Senator Suzanne Weber, Bay City Mayor Lianne Welch, and Bay City Public Works Manager Roy Markee

“These valves will automatically shut off the flow of water in an earthquake,” Roy Markee, Public Works Manager for Bay City, explained to the group assembled at the water tank on Pennsylvania Avenue. “That way, when the water pipes break in an earthquake, we don’t lose all of our water.”

Safe drinking water is one of the most critical needs in a disaster. In the event of the Cascadia Fault Earthquake and Tsunami, it is likely that residents between the Kilchis River and 101 bridge and the Miami-River Bridge will be cut off in an “island” due to bridge damage. The existing water systems will suffer catastrophic damage and will not be repairable. This will be happening all along the Oregon and Washington coastlines.

While everyone who lives in the Bay City island between Juno Hill and the Miami River Bridge are all encouraged to have their own water filtering system such as a Sawyer Squeeze or other portable system and understand sanitation, a reservoir of safe water will save lives. Bay City also installed a hand pump system at the reservoir that can be used to fill water containers in the event that the water pipes are damaged.

“This tank holds up to 500,000 gallons,” Markee said. “We have another tank on Juno Hill that holds 500,000 gallons that has the second seismic valve.” Bay City is building a second tank on Juno Hill that will also hold 500,000 gallons. These tanks will both be connected to the second seismic valve. Bay City currently has four reservoirs and two are equipped with the seismic valves.
The Bay City water system on Juno Hill primarily supplies water to the Tillamook Cheese Factory, Sollie Smith road, and that area. In addition, through the intertie between Bay City and Tillamook, Bay City has supplied water to Tillamook, too.

The City of Bay City in partnership with the Bay City Emergency Volunteers (BCEV) is continually working on preparing for potential disasters, including the predicted Cascadia Fault earthquake and Tsunami event. Communities along the coast, such as Bay City, Rockaway Beach, and Cannon Beach, are looking for ways to help residents after such an event. The seismic valves are one part of this process.

The Bay City Emergency Volunteers meet on the third Monday of each month at 5:30 PM in the city hall. They are looking for people from inside Bay City and around Bay City, such as Idaville or Pike Road, who want to help their neighborhoods prepare. In a significant major disaster, emergency services are overwhelmed, and it is up to neighbors to help neighbors. In the worst-case scenario, the Cascadia event, there may not be emergency services for a long time.

To learn more about Bay City’s efforts to prepare for disaster, reach out to Bay City City Hall at 503-377- 2288.

Slide Slide Slide Slide Slide Slide Slide Slide Subscribe Contribute

Ads

Featured Video

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Bay City Completes Installation of Valves to Protect Water Supply During Earthquake

    July 15, 2025
  • A PERONSAL POINT OF PRIVILEGE: The Walkout Cult Isn’t Defending Liberty—It’s Burning It Down

    July 15, 2025
  • Tillamook County Joins National John Lewis Day of Action – “Good Trouble Lives On” in Tillamook & Nehalem on July 17th

    July 14, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}