Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Highway 101/6 Project Update – 3/23/18

Posted on March 24, 2018April 3, 2020 by Editor

By Sierra Lauder, Director of Events and Downtown Development, Tillamook Area Chamber of Commerce

The days are getting longer and we are seeing lots of action scattered across the entire project footprint as we prepared for some big changes.

On Main St., at the junction of Main and Third, the pedestrian crossing lights have been set and will go live as I’m drafting this email. For those of you who have been struggling to make heads or tails of how to use that intersection, the signals will be now be up and running, just in time as traffic picks up for Spring Break.

The final section of sidewalk replacement on the east side of Main is the short stretch just north of Second, in front of The Local Doghouse, Mathew Lyon’s office and Food Roots. The forming of the curb and gutter took place Thursday, and if the weather allows, the concrete pour will happen today. The weather looks very promising next week, and the ADA ramp at that corner is scheduled to be formed and poured at the beginning of the week and the last little bit of sidewalk in the last half of the week. The first week of April will be spent wrapping up any loose ends there, including getting the bioswale liners installed, all in preparation for the looming traffic shift that will push traffic to the east side, and kick off the construction on the west side of Main.

Placement of the “beehive”- this is the top of the chimney-like structure inside of the bioswales that acts as a traditional storm drain when the rain is heavy and the plant filtration is insufficient.

Along the bridge, curing of the large deck pour continues this week, shifting the focus to the end wall areas, and the forming of the sidewalk and overlook area on the southwest side of the bridge. This is also in preparation for transition- soon the final grading, drainage work, curb and gutter, sidewalk, and paving will take place on the west side of the road between Front and First, and traffic that is southbound coming over the bridge will be shifted to the west side of the road, creating room for work to take place along the west side of the old Shell Station property.

Folks often ask about the future of that Shell Station property, and it is still largely unknown. Once the project completes, the property will be surplussed by ODOT, and local governments will have the opportunity to purchase it. The City is aware of this trajectory, and has started a feasibility study to determine whether the parcel will be viable as a commercial property, or will be better suited for another use. We will do our best to keep you apprised of any developments in that ongoing conversation.

In response to the suggestion that more signage might encourage late merging and use of the zipper strategy, ODOT has coordinated with the City to put a sign up just south of Goodspeed Road requesting drivers use both lanes. Despite all of the various efforts to get out the word, you will likely still observe a gap in folks embracing the zipper merge. Be patient, but also be leaders- don’t be afraid to use the right lane, and merge as late as possible. As spring break traffic comes to town next week, maximizing all of the lane capacity available is the best way to keep the line from backing up out of town.

Good luck and be safe out there.

You may have noticed the LARGE heating oil tank that was discovered in the large bioswale that is being excavated on the northeast corner of First and Pacific near the Hoquarton Park. Testing is underway and things are looking optimistic for that bioswale to be completed and lined with the others along Main (both in downtown and on North Main near Tillamook Diesel) the first week of April.

For more FAQ’s about our project, including conceptual drawings that help visualize the project in its entirety, you can check out the ODOT page: www.TillamookTraffic.org

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • GORDON'S WEEKEND WEATHER UPDATE 5/22/25: Stay tuned, warmer, dryer weather on the way...

    May 22, 2025
  • OBITUARY: Richard 'Dick' LeRoy White - July 7, 1938 - May 17, 2025

    May 22, 2025
  • David's Chair Now Available at Rockaway Beach - Official Dedication, Blessing May 17th

    May 21, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}