Tillamook County Pioneer

News & People of Tillamook County. Every Day.

Menu
  • Home
  • Feature
    • Breaking News
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
    • Chuck McLaughlin – 1928 to 2025
  • Weather
  • Post Submission
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Search...
Menu

Manzanita Classic Street Reconstruction: What City Officials Prefer To Avoid Explaining

Posted on October 12, 2025 by Editor
By Randy Kugler
City Officials are scrambling to control the narrative on what is becoming the debacle on the Classic Street reconstruction project. Here’s a summary to date:
In August 2024, the City Manager issued a Request For Proposals allowing engineering firms to  provide proposals for professional engineering services and construction administration. The request included the unusual requirement that “all proposers must have been in business as their current entity for at least five years”. This effectively eliminated North Coast Civil Design, a local firm with 25 years of  experience including the design, overview, and construction administration services for the Dorcus Lane Reconstruction Project. North Coast Civil Design was viewed to be in existence in their “current entity”  as a business for 3 years thus effectively preventing them from even submitting a proposal for consideration.

City officials retain Windsor Engineers from Portland, pay them $424,000 for presenting a project to the community for 2,000 feet of road widening, a new 10 ft. wide paved pedestrian path, over 3,000 ft. of new water main, over 1,000 linear feet of retaining wall for the extreme slope along the west side of Classic Street, and stormwater improvements. Unfortunately, key provisions of that design will not now be built and Windsor Engineers was removed from the project with no public explanation. City officials now decide to select North Coast Civil Design to salvage a project that squandered both time and money. No explanation given as to why the 5 year prohibition preventing a submittal a year ago was no longer relevant.
Classic Street is defined as a Minor Collector street due to the volume and type of traffic it carries and as such is required by City Ordinance to have minimum eleven foot travel lanes. City officials plan to ignore their own Ordinance requirements and maintain the existing 10 foot travel lanes for a considerable portion of the project. The 2 foot wide landscape buffer that was designed to separate vehicle traffic from pedestrians has been eliminated thus maintaining the existing unsafe conditions for bikers and pedestrians.Despite the fact that Councilors take an oath to uphold City Ordinances, when that oath becomes inconvenient, they simply ignore it and hope no one notices.
Perhaps the most important element of the project identified by Windsor Engineering was the need for a retaining wall or other suitable engineering measures along the steep slope that forms the west boundary of Classic Street. The Windsor consultants noted the  pavement condition along the west side of Classic Street and confirmed that the underlying base is moving or otherwise failing. There will be no retaining wall built to arrest this movement which will only be exacerbated by the increasing levels of traffic on Classic Street in the years to come. The exact condition of the existing road base is also unknown. Old timers recall when the original road base was put in with substandard materials including old tires and the City then failed to overlay the road base with sufficient asphalt.
The City continues to pay legal fees and awaits a verdict out of Tillamook Circuit Court resulting from a prospective bidder who alleges the City engaged in an improper bid process. The City Manager claims that visitors pay for most of our infrastructure improvements yet not a single dollar of Transient Lodging Tax money from those visitors has been budgeted for this project to assist funding the construction as recommended by the Windsor consultants to create a long term stable roadway with sufficient width to provide safe conditions for pedestrians and bikers.
No announcement from the City as to when the new design which bears little resemblance to the one presented last year, will be presented to the public at a meeting for review and questions. Also, a firm cost for the above described project remains unknown and likely will need to be increased if some of the unknowns need to be corrected. After all, what could possibly go wrong?

Slide Slide Slide Slide Slide Slide Slide Slide Subscribe Contribute

Ads

Featured Video

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Manzanita Classic Street Reconstruction: What City Officials Prefer To Avoid Explaining

    October 12, 2025
  • Falcon Cove Beach Domestic Water Supply District Board Meeting Oct. 18th

    October 12, 2025
  • United Paws Kittens of the Week - A Whole Kitten Caboodle

    October 11, 2025
©2025 Tillamook County Pioneer | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}