Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Road work at Hwy 101 and Farmer Creek… U.S. 101 Farmer Creek Bridge replacement project to begin soon

Posted on September 21, 2019 by Editor
www.tillamookcountypioneer.net

TILLAMOOK—A project that will replace the Farmer Creek Bridge on U.S. 101 south of Beaver and realign a section of the highway, will begin in the next few days.
In addition to building a new bridge, the project includes the realignment and widening of the road to improve sight distance from Farmer Creek Road, new guardrails, striping and traffic signs and improvements to the wayside.
In order to minimize delays and maintain traffic lanes in both directions, the project will be done in stages. At times, traffic control will require 24-hour flagging with pilot cars. At which time travelers can expect up to 20 minute delays. TripCheck.com will be kept up to date to keep road users informed of construction impacts.

The project staging will include temporary widening of the road, constructing most of the new bridge, realigning traffic on to the new (partial) structure, demolition of the old bridge, reconstructing the stream channel and completion of the new bridge.
The Farmer Creek Wayside and Boat Launch just southeast of the bridge will be closed during reconstruction of the wayside. Alternative boat launches are located at the First Bridge Launch near Beaver and the Three Rivers Boat Ramp to the south of the project. The closure dates will be posted at the wayside.
The bridge is currently over 50 years old and its timber deck is in poor condition.
The scheduled completion is fall 2020. The cost of the project is $4.3 million.
Access for pedestrians, including those with disabilities, is available and identified through or around work zones.

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Grove avenue closed in Tillamook for maintenance

    May 10, 2025
  • Astoria Farmers Market new, outdoor location with parking, with great Riverwalk access

    May 10, 2025
  • WORDS OF WISDOM: Boycotts and Protests in our Community Garden

    May 9, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}