Tillamook County Pioneer

News & People of Tillamook County. Every Day.

Menu
  • Home
  • Feature
    • Breaking News
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
    • Chuck McLaughlin – 1928 to 2025
  • Weather
  • Post Submission
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Search...
Menu

Tillamook PUD Completes Tillamook-to-Oceanside Transmission Line and Oceanside Substation Project

Posted on November 2, 2026 by Editor

 

(TILLAMOOK, OR, November 2, 2026)— Tillamook PUD has energized the newly constructed 115-kilovolt Tillamook to Oceanside transmission line and Oceanside 24.9-kilovolt distribution substation. This infrastructure strengthens electric reliability for approximately 2,000 customers in the Oceanside and Netarts area, as well as marks the completion of a major project first identified in the utility’s 1963 long-range plan.
“This significant project reflects decades of thoughtful planning, careful design, community collaboration, and dedicated construction,” said Tillamook PUD General Manager Todd Simmons. “We are proud to see this long-term vision become a reality. The new transmission line and substation are critical investments that will strengthen system reliability and support the evolving needs of our coastal communities.”
The nine-mile transmission line and new Oceanside Substation provide Netarts and Oceanside with a much-needed second source of power. Previously, both communities depended on a single distribution line supplied by the Wilson River Substation, meaning a vehicle striking a pole, a tree falling into a power line, or another incident could interrupt service to every customer beyond the damaged section. The new infrastructure allows Tillamook PUD crews to isolate damage and restore electric service more quickly to unaffected areas. Additionally, greater safety margins, including sturdier structures, wider rights-of-way, and undergrounding of new and existing structures, help reduce the frequency and duration of outages caused by factors such as severe weather, falling trees, vehicle accidents, and equipment issues.

The new transmission line and substation also increase capacity and operating flexibility across central Tillamook County. By shifting electric load from the Wilson River Substation to the Oceanside Substation, Tillamook PUD can ease capacity constraints, accommodate future growth, and transfer loads between substations during maintenance or outages.
The project also included improvements at the Wilson River Substation to strengthen the reliability of the Pacific Power transmission line serving customers in northern Tillamook PUD’s service territory. Incoming Bonneville Power Administration and Pacific Power transmission lines have been reconfigured to simplify future maintenance and repairs. Automated switching equipment is also being installed to help restore power outages related to the Pacific Power Transmission line more quickly in north Tillamook County. This portion of the project is expected to be completed in 2027.
The project represents a significant investment in reliable electric service for Tillamook PUD’s coastal communities. “We are grateful to our customers and community members for their patience, collaboration, and support throughout this project,” Simmons said. “Their partnership was essential to bringing this long-planned project to completion.”

Please consider supporting the Pioneer with a contribution. Independent journalism stays alive on the Coast. Click here to contribute!
Subscribe

Ads

  • 14 days
Keep the News Free to Read

Featured Video

Tillamook Weather

Tides

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Tillamook County Pioneer Podcast Series

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Tillamook PUD Completes Tillamook-to-Oceanside Transmission Line and Oceanside Substation Project

    November 2, 2026
  • BUTCH'S BLOG: Three Brilliant TV Dramas

    November 2, 2026
  • NORTH COUNTY RESISTANCE - Where to from here?

    November 2, 2026
©2026 Tillamook County Pioneer | Theme by SuperbThemes
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}