Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Highway 101/6 Project Update – 8/22/18

Posted on August 22, 2018 by Editor

By Sierra Lauder, Director of Events and Downtown Development, Tillamook Area Chamber of Commerce

This week the roof is being replaced on the Chamber Headquarters building on Main Avenue, which is also the Visitor’s Center. While the sidewalk out front has been complete (and access to our front door open) for quite some time, the Dutch Mill (our neighbors to the north) are currently renovating their façade, where, in addition to the temporary removal of their iconic sign for refitting, the awning has come off along with the front siding- equating to a rather large pile of construction debris at short intervals. Two awestruck out-of-towners seeking hotel information navigating Main on Monday stopped in and asked if we had coordinated all of our downtown building remodeling with the timing of the Highway Project, and while we laughed together in the moment and talk turned toward local accommodation options, the reality of their observation is worthy of reflection.

Despite a noisy bunch of social media commentators who would have you believe that “downtown is dying,” all evidence points to downtown being on the verge of an entirely new life. Every single block in the Tillamook Main Street “Downtown District” has renovation projects either recently completed, on the immediate horizon, or actively underway.

Every single block.

While there is zero doubt that the construction impacts of the Highway Project have been extremely challenging and have created intense hardship for the economy and the commute through town, the coinciding business expansion in downtown, number of real estate transactions on commercial properties in the downtown core, and the large number of private investment dollars being invested to revitalize the infrastructure of the buildings is a promising indicator that Tillamook is weathering these trials and that the future is bright.

The bioswale and curbing are poured on Third, west of Main. Owners of the Beals Building are working with the contractor to privately fund extending the new sidewalk to the west end of the building.
One example of these efforts is on Third Street, on the west side of the intersection of Main. The water main work has been completed there, and the contractor is expecting the sidewalk along that corner to be poured and in place next week. The eastern edge of the project would have brought the sidewalk work to a stop about two-thirds of the way along the side of the historic Beals Building. Recognizing that this is the moment to maximize the efficiency of the crews on the ground, investor owners Valerie Schumann and her husband Gary have connected with the contractors and have decided to privately fund the sidewalk work along the remainder of their building, bringing the new stamped concrete eastward from Main up to the alleyway. When speaking with Gary yesterday, he explained that after the roofing work they did to make sure the building is dry inside, they have now begun more extensive interior work and are addressing many of the realities of renovating a one hundred-plus year-old building, including sorting out asbestos abatement, plumbing headaches, and comprehensive electrical work.
A view of the finished curb and bioswale on the corner of Second and Main in front of Fat Dog Pizza. The sidewalk is set to be poured there in the next week; meanwhile, the temporary ramp provides business access.
Further north on Main, the sidewalk in front of Fat Dog Pizza is on track for being poured later this week. The Alderman Building, which hosts Fat Dog Pizza, Voo Doo Vapor, Shanny’s Nail’s and Second Street Coffee, recently had the long awning that stretches from the western corner of the building on Second toward Main rebuilt and refitted, providing shelter from both rain and the occasional intense sun for the outdoor seating there.

Bear with it, folks. Change is hard and slow and disconcerting, and in the end we will likely all be able to point at things we wish were different, but the tide is pushing us all along and as we near the end of this project and there becomes less and less to report about projected timelines, there becomes more and more to see and do unfolding in front of us. In the next few weeks, the top soil in many of the bioswales will go in, and the street trees will begin to be planted. Pavers along Main will begin to fill the gap between the new sidewalk and the curb, and the paving and subsequent reopening of parking along Main is in the not-too-distant future. If you are looking for an excuse to explore the Downtown District in the next few weeks, September 1st the Tillamook Revitalization Association and the Headlight Herald are hosting a community garage sale, and booths are available for $15- just register at the Headlight Herald or Lucky Bear Soap. The following Saturday, September 8th, the Monday Musical Club of Tillamook is hosting their annual Oktoberfest event, which is a great family-friendly day of live music and delicious food (and also beer for those 21+).

Hope you all are enjoying these final weeks of August, and please be safe out there.

A note from Tillamook Chief of Police, Terry Wright:
Please be advised that the speed limit on Pacific northbound over the new bridge is 20 mph. An astonishing number of local drivers have been ticketed for excessive speed through the area. There is a new crosswalk that stretches from Hoquarton Landing to the “gore”/old Shell Station in that 20 mph zone that drivers need to be aware of.

For more FAQ’s about our project, including conceptual drawings that help visualize the project in its entirety, you can check out the ODOT page: www.TillamookTraffic.org

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • U.S. Coast Guard Barque Eagle to participate in Portland Rose Festival June 5-8; Docks in Astoria June 13-15

    May 30, 2025
  • TSD9 Election Tainted by Hate Speech

    May 30, 2025
  • TRYING TO SEE: Trump’s People Like His Evil Cunning

    May 30, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}