Tillamook County Pioneer

News & People of Tillamook County. Every Day.

Menu
  • Home
  • Feature
    • Breaking News
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
    • Chuck McLaughlin – 1928 to 2025
  • Weather
  • Post Submission
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Search...
Menu

Tillamook County announces Bayocean Road closure, detour for Bridge Construction Scheduled August 5-September 5

Posted on July 25, 2024July 25, 2024 by Editor

(TILLAMOOK, Ore., 22 JULY 2024) — Tillamook County announces the upcoming closure of Bayocean Road at milepost 2.4 (between the Memaloose Boat Launch and Bayocean Dike Road) for the construction of a permanent bridge over Dick Creek. The road closure will take effect from Aug. 5 to Sept. 5, with no accommodations for pedestrian or bicycle traffic.

In December 2015, the culvert conveying Dick Creek on Bayocean Road blew out, necessitating the installation of a temporary bridge. Now, after thorough design and permitting processes, Tillamook County has selected a contractor to build a permanent bridge.

Closure Details:

  • Dates: Aug. 5-Sept. 5.
  • Location: Bayocean Road at milepost 2.4 (between the Memaloose Boat Launch and Bayocean Dike Road).
  • No Access: No accommodations for pedestrian or bicycle traffic will be made during this closure period.
  • Environmental Constraints: The timing of the road closure is based on environmental limitations and cannot be accelerated. However, the contractor will make every effort to reopen the road before Labor Day weekend.

To accommodate travelers during the closure, a detour route has been established:

  • Route: Take OR 131 to Oceanside, turn right onto Cape Meares Loop Road, and follow signs over the new alignment of Cape Meares Loop Road; this road intersects with Bayocean Road at Cape Meares Lake. Take a left to the community of Cape Meares or a right to access Bayocean Dike Road.
  • Signage: Detour signs will be installed to guide the traveling public.

Project Team:

  • Contract Manager: ODOT
  • Engineer: OTAK, Inc.
  • Contractor: Farline Bridge, Inc.

The County appreciates the public’s understanding and cooperation during this essential infrastructure improvement project. The new permanent bridge will enhance safety and accessibility for all travelers in the region.

For any questions or further information, please contact Tillamook County Public Works at 503-842-3419.

Please consider supporting the Pioneer with a contribution. Independent journalism stays alive on the Coast. Click here to contribute!
Subscribe

Ads

Keep the News Free to Read

Featured Video

Tillamook Weather

Tides

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Tillamook County Pioneer Podcast Series

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • TILLAMOOK COUNTY EMERGENCY MANAGEMENT ADVISORY: Coastal Flood Advisory from 04:00AM Sunday 11/22/26 until 04:00AM Tuesday 11/23/26

    November 21, 2026
  • OREGON DEPT. OF FORESTRY: STATE CAPITOL GETS ITS HOLIDAY TREE FROM TILLAMOOK STATE FOREST

    November 20, 2026
  • OREGON DEPT. OF FISH & WILDLIFE: Oregon’s Commercial Dungeness Crab Season Delayed until Dec. 16

    November 20, 2026
©2026 Tillamook County Pioneer | Theme by SuperbThemes
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}