Menu
  • Home
  • Feature
    • Breaking News
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Weather
  • Post Submission
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Search...
Menu

ODOT Construction Projects: Arch Cape Tunnel; Young’s Bay Bridge; Farmers Creek/Hwy. 101

Posted on January 9, 2020 by Editor

US 101: Arch Cape Tunnel Lighting Replacement Project (Clatsop County)
(Oregon Coast Highway, mileposts 35.16 to 36.42)
This project includes work as follows:
Install temporary traffic control and;
Install pedestrian and bicyclist signals on either side of the tunnel; and
Replace overhead lighting in the tunnel.
This Project consists of installing new tunnel lighting and updating the electrical system in the tunnel on US101. New signs and signals for bike access will be installed on either end of the tunnel. One or more Traffic Lanes may be closed on the Oregon Coast Highway (US 101) during the following periods of time starting January 6th 2020:
Daytime lane closures Monday – Thursday from 7:30 am to 5:00 pm
Daytime lane closures Friday from 7:30 am to 12:00 pm (Noon)
Except for Holidays: Between noon on the day preceding a legal holiday or holiday weekend and midnight on a legal holiday or the last day of holiday weekend, except for Thanksgiving, when no lanes may be closed between noon on Wednesday and midnight on the following Sunday.

US 101: Young’s Bay (New Youngs Bay) Bridge Repair Project (Clatsop County)
(Oregon Coast Highway, mileposts 4.53 to 5.33)
This project includes work as follows:
Install temporary traffic control and;
replacing rocker bearings;
repairing the damaged concrete with cathodic protection; and
replacing compression joint seals.
Initially in mid March, the traveling public will notice the contractor building the containment structure which will be attached to the sides of the bridge, and a barge in the water with support boats bringing crew and materials to and from the barge. Once the containment structure is in place, actual construction will begin. Most of the construction will be performed below the bridge from the barge.
The traveling public can expect periodic single lane closures at night to allow the contractor to move equipment and perform repair work on the bridge. The lane closures will be Sunday night through Friday morning, 9 p.m. to 5:30 a.m. A pilot car may be used to guide traffic through the lane closure. A complete two week night time closure of the bridge is scheduled in 2021 toward the end of the project.
An alternative route during periods of lane closures and the full night time closure is U.S. 101B over the Old Youngs Bay and Lewis and Clark River Bridges.

US 101: Farmer Creek Bridge Sec. (Tillamook County)
(Oregon Coast Highway, mileposts 82.74 to 83.08)
The work to be done under this Contract consists of the following:
– Construct roadbed, aggregate base and asphalt concrete pavement.
– Construct concrete curbs and islands.
– Perform earthwork
– Construct Bridge No 22654
– Install drainage, guardrail, pavement markings and signing.
– Reconstruct waterway passage.
– Perform additional and incidental work and called for by the Plans and Specifications
This Project consists of installing temporary widening to accommodate traffic, constructing most of the new bridge, realigning traffic on to the new (partial) structure, demolition of the old structure, channel reconstruction and completion of the new Bridge. There will be 24 hour flagging during the stage construction with pilot cars. Traffic restrictions employing 24 hour flagging may occur beginning:
September 1, 2019 through June 30, 2020 and September 1, 2020 through November 30, 2020 between 7:00pm Sunday and 12:00 pm Friday. Except between 12:00 noon preceding a legal holiday or holiday weekend and midnight on a legal holiday or the last day of a holiday weekend except for Thanksgiving, when no lanes may be closed from noon on Wednesday and midnight the following Sunday. Additionally, The Clover’s Day Festival is included as a Special Event which will be regarded as a holiday for this Project.
Single lane traffic will be allowed nightly only:
From July 01, 2020 through August 31, 2020, Sunday night through Friday morning between 5:00 pm and 11:00 am.
The Wayside will be closed for stages of construction and will be signed with the closure dates two weeks prior to being closed.

Access for pedestrians, including those with disabilities, will be available and identified through or around the work zones.
For updates on traffic, go to www.TripCheck.com or call 511.

Slide Slide Slide Slide Slide Slide Slide Slide Subscribe Contribute

Ads

Featured Video

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • OREGON DEPT. OF FISH & WILDLIFE SHELLFISH ALERT: Mussel harvest closure Tillamook Head (South of Seaside) to north Jetty of the Siuslaw River

    June 27, 2025
  • PORT OF GARIBALDI: South Jetty Project Update from U.S. Army Corp of Engineers

    June 27, 2025
  • OREGON STATE POLICE: FATAL CRASH - HIGHWAY 101 - CLATSOP COUNTY, THURSDAY, JUNE 26, 2025

    June 27, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}