Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Tillamook PUD Inspection and Treatment of Wood Power Poles Program

Posted on September 10, 2024September 10, 2024 by Editor
www.tillamookcountypioneer.net

(September 9, 2024) – Tillamook PUD has contracted with National Wood Treating Co. to perform detailed inspections and treatments on wood power poles throughout the Tillamook PUD electric system.
The power poles scheduled for inspection are located in central Tillamook County, including the Wilson River Highway area and from the Latimer Road area north to Bay City.
During inspections, it may be occasionally necessary at some locations for a National Wood Treating Co. contractor to cross private property to access poles that are located within Tillamook PUD’s easements and rights-of-way.
The process of pole inspections and treatments is essential to Tillamook PUD’s system safety program. This program enhances public safety, reduces long-term operating costs, and lessens the occurrence of unexpected power outages.

During inspections, each pole will be visually inspected, sounded with a hammer, and holes will be bored to determine if the pole is decayed. Some poles may need to be replaced; all other poles will be treated.
To treat power poles Tillamook PUD utilizes SmartFume, a modern system designed to stop and prevent internal decay. With SmartFume technology, a sealed capsule of fumigants is placed in a bored hole on the power pole and is then plugged with a plastic dowel. This process reduces fumigant exposure to the applicant and allows for a sustained release of treatment over time. Unlike other types of fumigant treatments, SmartFume works immediately and bonds to the wood to increase the longevity of the pole. SmartFume fumigants are registered with the Environmental Protection Agency and National Wood Treating Co. contractors are licensed by the Oregon Department of Agriculture for the commercial application of pesticides.
Inspection activities will begin on September 9 and will continue over the next several months until the spring of 2025.
Questions or concerns? Please contact Tillamook PUD at (503) 842-2535 or service@tpud.org.

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • David's Chair Now Available at Rockaway Beach - Official Dedication, Blessing May 17th

    May 21, 2025
  • GORDON'S VOLCANO UPDATE 5/21/25: Volcano to Erupt West of Astoria THIS YEAR!

    May 21, 2025
  • A PERSONAL POINT OF PRIVILEGE: Hurry Up and Wait

    May 21, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}