Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Facebook Conducts Survey at its Drilling Site in Tierra Del Mar

Posted on December 5, 2020 by Editor

By Ed Ruttledge
Facebook subcontractors have been conducting a high tech review of what went wrong earlier this year in its on ongoing industrial level drilling project on lot 3200 in Tierra Del Mar. Facebook’s wholly owned subsidiary, Edge Cable, revealed it has conducted additional survey work using:
” … Electric Resistivity (ER) and Sub-Bottom Profiler (SBP). The Electric Resistivity was acquired using ground cables which lay across the ground and seafloor with exposed electrodes every 4m with a total of 56 electrodes. The method used to acquire the data was the Strong Gradient Method ///The SBP was acquired with a Bubble Pulser source utilizing the Single Channel Seismic (SCS) record technique.”
Further, Facebook/Edge Cable acknowledged this survey “ … detected a possible sandstone or basaltic geologic formation approximately halfway into the drill path.”
Facebook admitted, however, “ …The mineral composition, hardness and depth of the formation is not yet fully defined.” Facebook plans to return to the drilling site to conduct additional survey work in January. Facebook’s drilling project came to an abrupt halt in April when the drill broke causing industrial trash to be abandoned below the sea floor.
It is not known why Facebook failed to conduct this survey work before its initial attempt to drill a bore hole in Tierra Del Mar earlier this year.

Here is the email that was sent to Tierra Del Mar residents 12/3/20 with links to the various documents:

Jupiter Cable Project Construction Plan

Dear Community Members,

In accordance with our easement agreement, we are sharing the findings from our survey work and the updated plans for the Jupiter Cable Project that have been submitted to the Oregon Department of State Lands. The following documents were submitted to the Oregon Department of State Lands this week:

  • HDD Geophysical Exploration Survey Report – Summary of the results of the beach and offshore survey work
  • HDD Construction Plan – Draft of the drill plan based on the survey findings
  • Drill Break Avoidance Plan – Overview of precautions we are taking to prevent a drill break
  • Drill Break Response Plan – Overview of steps we will take if there is a break

  As you may remember, there is still one more survey we plan to conduct. The borehole core sample on Lot 3200 is planned for January 2021 and will supplement our existing survey data. The HDD Construction Plan may be revised as the 2020 geotechnical data is further analyzed or as feedback is received from stakeholder agencies. We will keep you informed about any significant updates to the plan.

We also submitted this Addendum to the Construction Management Plan to Tillamook County on Wednesday, November 25.

Featured Video

Slide Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • Tillamook FFA Excels in State Career Development Events: Two Teams Headed to Nationals

    May 12, 2025
  • Tillamook Police Department Invites Community for Coffee with a Cop May 14th

    May 12, 2025
  • GORDON'S WEEKLY WEATHER UPDATE 5/12/25: Showery Pattern Continues Through Week

    May 12, 2025
©2025 | Theme by SuperbThemes

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}