Skip to content
Tillamook County Pioneer
Menu
  • Home
  • Feature
    • Breaking News
    • Weather
    • Community
    • Guest Column
    • Op-Ed
      • From the Pioneer
      • Letters to the Editor
    • Astrology
    • Employment
    • Obituary
  • Events Calendar
  • Subscribe
  • Legal Notices
  • About
    • History
    • Catherine Langer Prints
    • Resources
    • Tillamook County Giving Guide
    • Nestucca School District
  • Contact
    • Register
    • Advertising
  • Contribute
  • EULA Privacy Policy
Menu

Little Nestucca River Hwy. OR 130 will remain closed between OR 22 and U.S. 101 for bridge repair

Posted on January 4, 2023
www.tillamookcountypioneer.net

(Jan. 4, 2023 -LITTLE NESTUCCA HIGHWAY) – OR 130 will remain closed until at least late January during repairs to the bridge three miles west of OR 22.

We need to replace a steel beam in the upper support structure that was struck by a vehicle during the Dec. 27 storm. We hope to complete repairs by the end of January, but we cannot set an exact date because winter weather may cause delays.

OR 130, also known as the Little Nestucca River Highway, links the community of Dolph on OR 22 with U.S. 101 near Pacific City. OR 22 is the best alternate route for passenger vehicles traveling in the area, but it is weight-restricted for commercial vehicles.

The highway is open for local traffic, but local drivers must use the section of OR 130 on their side of the bridge. We apologize for the longer detour the closure will cause local residents.

Before you travel, visit TripCheck.com

Remember to slow down in wintry weather, leave plenty of space between you and other vehicles, and watch for vegetation and debris from recent storms. It takes longer to stop in wet and/or freezing conditions. Also bring traction devices if you cross snow zones and know how to use them.

 

Featured Video

Tillamook Weather

Tides

Ocean Inn Webcam

Archives

Recent Posts

  • OP/ED: Keep Our Schools Equitably Diverse

    February 2, 2023
  • $550,000 awarded in tourism facilities and marketing grants

    February 2, 2023
  • GORDON'S UPDATE: Weather 2/2/23; Groundhog Day Predictions

    February 2, 2023

Follow Us

Follow us on Facebook Follow us on Twitter Subscribe us on Youtube

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
©2023 Tillamook County Pioneer | Design: Newspaperly WordPress Theme